November 1, 2022

Hurricane Ian's Long Term Environmental Damage Underscores the Value of EcoVAP’s Wastewater Elimination Ability

Hurricane Ian's Long Term Environmental Damage Underscores the Value of EcoVAP’s Wastewater Elimination Ability

November 1, 2022

Following Florida’s hurricane Ian, the clean-up continues, but some contamination from overflowing wastewater storage and evaporation ponds is likely to lead to toxic soil and freshwater for years to come.  Florida and much of the Southeast US have a difficult wastewater problem given a plethora of industries that need to dispose of toxic waste and wastewater (including phosphates and various mining, farming, livestock, paper, concrete, asphalt, metal and many other industries) vs. few safe means for disposal (i.e., few injection wells, and ocean dumping is illegal for most industries).  Thus, the state relies on thousands of storage, treatment and evaporation ponds that overflow during torrential rains and with toxins that can be carried by winds for hundreds of miles.  EcoVAP’s ability to reduce wastewater volume by >95%, without using practically any energy or land, is ideally suited to be a low-cost, environmentally-friendly means of reducing or eliminating these toxic ponds and lagoons.  Despite Florida’s high humidity, EcoVAP has proven its ability to evaporate at >25x the normal rate even during the state’s cooler, humid months.

https://www.nytimes.com/2022/09/29/climate/hurricane-ian-toxic-waste.html

Latest News

Stringent New Standards for Tailing Pond Wastewater
November 2020
A joint report (August 2020) by the United Nations Environment Program and the International Council on Mining and Metals calls for much higher safety standards and regulations for managing mining tailings ponds.
Development of One of the World’s Largest Gold Mines Halted Due to Wastewater Disposal Risks
November 2020
Environmental approval for the biggest open-pit mining project in Latin America is being continually delayed due to environmental concerns about the difficulty of wastewater disposal and tailings dam safety.
BHP Brazil Tailings Pond Lawsuit at $6.3bn, Nearing Court Date
October 2020
The total claim for the 2015 BHP/Vale tailings pond collapse has risen to $6.3bn and is nearing a court date pending several jurisdictional disputes.
WASHINGTON POST
MARCH 2021
Army Corps denies permit for massive gold mine proposed near Bristol Bay in Alaska
WASHINGTON POST
MARCH 2021
Army Corps denies permit for massive gold mine proposed near Bristol Bay in Alaska
WASHINGTON POST
MARCH 2021
Army Corps denies permit for massive gold mine proposed near Bristol Bay in Alaska
WASHINGTON POST
MARCH 2021
Army Corps denies permit for massive gold mine proposed near Bristol Bay in Alaska
WASHINGTON POST
MARCH 2021
Army Corps denies permit for massive gold mine proposed near Bristol Bay in Alaska
WASHINGTON POST
MARCH 2021
Army Corps denies permit for massive gold mine proposed near Bristol Bay in Alaska